Non-Destructive Testing laboratory center


We help you make the right decision


Introduction:

This program covers all the required details to pass the API 653 Above ground storage tank inspector exam. In addition it also covers the important design aspects of storage tanks and applicable ASME codes.


Program Structure:

- API 653. (8 days)
- API 650. (3 Days)
- API 651, API 652. (1 Days)
- API 577, API 575. (2 Day)
- API 571, 577, 575 and ASME V, IX. (2 Day)



Period:

16 Days / 96 Hours


Program Outputs/Outcomes:

This program: Create a qualified storage above ground tanks, ready for certification exam.in order to be Authorized tanks inspector.




Introduction:

This program gives a broad knowledge about “In-Service Piping Systems” and prepares students for the API 570 exam. The Program is designed to cover all aspects of process piping construction and in-service inspection requirements.


Program Structure:

- API 570. (5 days)
- API 571. (2 Days)
- API 574. (2 Days)
- API 577 & 578. (2 Day)
- B 31.3. (1 Day)
- ASME V, ASME IX. (2 Days).



Period:

14 Days / 84 Hours


Program Outputs/Outcomes:

This program: Create a qualified piping inspector, ready for certification exam. in order to be Authorized piping inspector.




Introduction:

This program prepares you to pass qualification exams for becoming an AWS Certified Weld Inspector (CWI); over a Two week period, for a total of 84 instructional hours.


Program Structure:

- The fundamental modules. (8 days)
- Part -A and practical. (3 Days)
- Part -B and practical. (2 Days)
- Q & A. (1 Day)



Period:

14 Days / 84 Hours


Program Outputs/Outcomes:

This program: Create Qualified Visual welding inspector, ready for certification examination.




Introduction:

This program gives a broad knowledge to the students preparing for API 510 Certified Pressure Vessel Inspector exam. The course covers all the required codes in detail with sample questions and code calculations.


Program Structure:

- API 510. (5 days)
- API 572. (2 Days)
- API 571, 577, 578, 575, 576. (3 Days)
- ASME VIII. (2 Day)
- ASME V, IX. (1 Day)
- Training Questions. (1 Days)



Period:

14 Days / 84 Hours


Program Outputs/Outcomes:

This program: Create a qualified pressure vessel inspector, ready for certification exam.in order to be Authorized P.V inspector.






Program Structure:

- Material Verification. (8 days)



Period:

8 Days / 48 Hours


Program Outputs/Outcomes:

This program: Define materials properties, applications, material selection and testing.


Copyright(c) www.NDTLC.com - Designed by: jhadalsyed@gmail.com